• Background

Drain Commission

Drain Commission

Culvert/Drain

Culvert/Drain Posted Fee Schedule

Fee Schedule
Effective March 26, 2012  

NOTICE TO PROPERTY OWNERS

This application and subsequent permit do not relieve applicant from meeting any applicable requirements by law or other public bodies or agencies.

 Step 1: Complete and submit the Drain Culvert Application.  Drain Culvert Application (PDF)

 Step 2: At the proposed tile site, provide a bright colored stake with owner’s name clearly printed upon it.

 Step 3: Make check payable to Monroe County Drain Commissioner.

Drain Culvert Permit    
    

Fees:  Widen an existing culvert...................................................................................... $100.00

           Residential and/or farm crossing.......................................................................... $250.00

           Commercial, industrial, developments, etc........................................................... $500.00

 
   
      
 RIGHT-OF-WAY / CONSTRUCTION PERMIT FEE SCHEDULE (1/2012)   
     Condition # 1:  $100.00/Project
          - Working within the established drainage easement  
             of a dedicated County Drain  
   
   
     Condition # 2:  $200.00/Project
          - Working within the established drainage easement  
             of a dedicated County Drain and crossing the Drain via  
             bore & jack or directional drill  
   
   
     Condition # 3:  $300.00/Project
          - Working within the established drainage easement  
             of a dedicated County Drain and crossing the Drain via open cut  
   
ROW Permit Application  
         
 Drain Relocation Review  
   Residential  $250.00+
  Commercial, Industrial & Developments, etc  $750.00+
            
 License Agreement to Encroach into Drain Right-of-Way or 433 Agreement 
   Residential  $250.00
   Commercial, Industrial & developments, etc  $500.00
          
 Drain Assessment Payoff  $25.00
 Minimum 5 day notice prior to the payoff date & yearly cutoff  
 for assessments will be August 1st  
            
 Design Criteria Publications:  
   Sanitary Sewer Specifications, Bedford Township   $10.00 
   South County Water System Standard Specifications   $10.00 
   Storm Water Detention Methodology   $10.00
   Storm Sewer Specifications  $10.00
        
*Based on Engineering Calculations  
+Review Fees Listed are the Minimum Requirements